Skip to content

Report a Typo or Mistake

Optional

Optional

Optional

Smith Crossing Pedestrian Bridge opens ahead of schedule
https://www.albertaprimetimes.com/edmonton-news/smith-crossing-pedestrian-bridge-opens-ahead-of-schedule-7600872
Verify
push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks